9-30-11
Charleston Stake Center
10 hrs worked today
Work performed today:
Drywall repair
Change bad tile
Fire caulk
Hole in drywall in Cultural Hall
Hole cut out for repair
Hole with tape and mud (will paint on Monday)
Another hole in Cultural Hall
Hole with tape and mud (will paint Monday)
Penetrations in sound room
Penetrations fire caulked with 3 hour caulk
Old door stop in Mens room
New door stop
Water stained tile
New tile
Water stained tile
New tile
We replaced several damaged tile throughout the building. We will start painting over the drywall repairs on Monday and continue on the punchlist
No comments:
Post a Comment