Monday, October 3, 2011

SC FM maintenance

9-30-11
Charleston Stake Center
10 hrs worked today

Work performed today:

Drywall repair
Change bad tile
Fire caulk

                                                              Hole in drywall in Cultural Hall

                                                                Hole cut out for repair

                                                Hole with tape and mud (will paint on Monday)


                                                          Another hole in Cultural Hall

                                                       Hole with tape and mud (will paint Monday)

                                                             Penetrations in sound room

                                                Penetrations fire caulked with 3 hour caulk

                                                        Old door stop in Mens room

                                                                         New door stop


                                                                   Water stained tile

                                                                               New tile

                                                                        Water stained tile

                                                                                     New tile




We replaced several damaged tile throughout the building. We will start painting over the drywall repairs on Monday and continue on the punchlist

No comments:

Post a Comment