10-3-11
Charleston Stake Center
10 hrs worked today
Work performed today:
Painted room 108
Painted drywall repairs in Cultural Hall
Repaired mop sink in custodial closet
Caulked cracks in Chapel ceiling
Sanded metal door in mechanical room
Room 108 before paint
Room 108
Room 108 (prep)
Room 108 painted
Room 108 painted
Painted drywall repair in Cultural Hall (wet paint)
Painted drywall repair in Cultural Hall (wet paint)
Rust removed from door in mechanical room
Crack in Chapel ceiling
Caulked crack in Chapel ceiling (still visible but not as bad)
Dirty beam in Chapel
Beam painted with Kilz and flat white paint
New valve on mop sink (working properly)
Will continue working on punchlist tomorrow. Most items are complete