Thursday, September 8, 2011

Charleston SC FM

Charleston Stake Center 9/8/11

Work performed today:
Finished sanding trim
Stained all trim and backside rostrum panels
Put polyurethane on all trim and panels
Applied first coat of paint to overflow ceiling
Re-finished podium platform

                                                    Removed panels from back side of rostrum


                                                         New rostrum panels (stain and poly)
                                                     
                        Re-finished rostrum platform (will put microphone back tomorrow after it dries)

                                                                 Trim and panels drying

                                                     Overflow floor covered to protect from paint

                                                    Overhead fixtures taped to protect from paint

                                                Overflow ceiling before first coat of paint applied

                               Overflow ceiling after first coat of paint (paint was still wet at time of pic)                                                                                                                                  
                                                          Second coat to be applied tomorrow


Tomorrow we will put the rostrum back together, apply second coat of paint, re-attach microphone and  clean up in time for Stake Conference