Tuesday, September 27, 2011

SC FM maintenance

9-27-11
Charleston Stake Center
10 hrs worked today
Work performed today:

Demo the rest of the old tile and insulation in the hallway beside the Cultural Hall
Put in new insulation and tile in hallway
Worked on punch list items
Clean up

                                               Broken light switch cover in Relief Society room

                                      New light switch cover in Relief Society room

                                            Unsecured HVAC vent in Chapel

                Secured vent to the wall. Chipped out block and secured with Liquid Nails

                                      Loose surface mount light in High Council room

                                    Light in High Council room secured tight to ceiling

                                             Loose door hardware in room 108

                                                  Door hardware tightened at 108

                                             Hallway prep and ceiling tile demo

                                          Old insulation and tile removed from ceiling

                                                    New R-19 insulation in ceiling

                                                 New R-19 insulation in ceiling

                                     New tile in ceiling (hallway is halfway complete)




I noticed on our punchlist that the gutter straps need to be wire brushed and re-painted. There are approximately 450 of these around the building. To make them look new again will require more than wire brushing and painting. They will all need to be sanded, primed and then painted and then the gutters would possibly need to be painted as well. This could take 2 guys up to 2 weeks or more to do this. Please let me know if you want us to proceed with this.