Friday, September 16, 2011

Charleston SC FM

9/16/11
Charleston Stake Center
10hrs worked today



Work performed today:
Touched up doors throughout building. Sanded doors and stained
Tightened and adjusted hinges on interior doors
 Most of these doors are in very rough condition. A lot of them have very deep cuts                                      

                                                                                         Before
                                                                               
                                                                                  After
                                                                                     
                                           

                                                                                     Before        
 

                                                                                After

                                                              Before (loose trim around window)

                                                 After (trim re-attached, door sanded and stained)

No comments:

Post a Comment