9/16/11
Charleston Stake Center
10hrs worked today
Work performed today:
Touched up doors throughout building. Sanded doors and stained
Tightened and adjusted hinges on interior doors
Most of these doors are in very rough condition. A lot of them have very deep cuts
Before
After
Before
After
Before (loose trim around window)
After (trim re-attached, door sanded and stained)
No comments:
Post a Comment