Sunday, November 13, 2011

SC FM maintenance

11-8-11
Mt, Pleasant Ward
9hrs worked
2 men

Work performed today:

Staging and planning
Adjusted door closers
Gather material
Door touch up

                                 
                                                                       Scuff marks on door
                               
                                                                 Scuff marks removed


                                                                         More scuff marks


                                                                        Scuffs removed

                                                            Adjusting closers to 7 seconds

                                                                          Scuffs on door

                                                                      Scuffs removed

                                                 This could be why the doors are getting damaged


All doors are damaged near the bottom. I would like to recommend that we put kick plates on all of them to prevent further damage

SC FM maintenance

11-7-11
Mt. Pleasant Ward
5hrs driving
2hrs gathering material
2 men

Wednesday, November 9, 2011

Charleston SC FM

Mt. Pleasant Building
9hrs worked
Work performed today:

Drywall repair
Closer adjustments
Painted brick lintels

                                                           Drywall crack in foyer

                                                         Drywall repaired in foyer

                                                                Crack at room 111 in hallway

                                                           Drywall repair at 111

                                                                                    Crack at 102

                                                                              Repair at 102

                                                            Rusty brick lintels at entrance
                                                       
                                                                         Painted brick lintels




Repaired drywall cracks and will begin painting tomorrow. Adjusted door closers. We will also start touching up doors and trim tomorrow
















Wednesday, October 5, 2011

SC FM maintenance

10-5-11
Charleston Stake Center
10hrs worked today

Work performed today:

Replaced insulation on outdoor AC units
Put second coat of paint on mechanical room door
Final touch up (adjusting closers,  checking off the punchlist, cleaning light fixtures)

                                                                        Worn out insulation

                                                                    Worn out insulation

                                                                            New insulation

                                                                         New insulation

                                                                        New insulation

                                                Second coat of paint on mechanical room door



The only items remaining on the punchlist are things that we can't do right now. Items include a broken window in 109,  new window in Institute room, light kit in class room. Stage doors have been adjusted as good as they can be. Door closers that will accept adjustment have been adjusted, however, most of these are worn and will not adjust. There is an item on the punchlist that says for us to wire brush and paint the gutter straps. This is gonna require more than wire brushing and painting. There are approximately 450 straps on the building. This would require sanding the straps without hitting the gutters with a sander. After they are painted, they are going to stand out from the gutters and then the gutters would possibly have to be painted. We were also informed that the roof is not tile, it's actually aluminum and bends very easily. Roof  access is needed to get to the upper section of the building. There are also interior doors that need to be replaced, they have been repaired as good as they can be. Please advise if you want us to move on to the next building
                                                                         



Tuesday, October 4, 2011

SC FM maintenance

10-4-11
Charleston Stake Center
9hrs worked today

Work performed today:

Second coat of paint in 108
Painted metal door in mechanical room
Replaced damaged receptacle
Fixed mic control on rostrum
Replaced wax ring on Ladies Room commode


                                                  Door at mechanical room sanded and painted

                                                           New receptacle on rostrum

                                                                 Receptacle on rostrum

                                                            Mic control box (wood coming apart)

                                                  Mic control box (glued and nailed in place)

                                       Wire mold in Cultural Hall secured to wall and painted

                                                         Second coat of paint in room 108

                                                        Old wax ring in Ladies Room

                                                        New wax ring in Ladies Room




Monday, October 3, 2011

SC FM maintenance

10-3-11
Charleston Stake Center
10 hrs worked today

Work performed today:

Painted room 108
Painted drywall repairs in Cultural Hall
Repaired mop sink in custodial closet
Caulked cracks in Chapel ceiling
Sanded metal door in mechanical room


                                                                  Room 108 before paint

                                                                            Room 108

                                                                             Room 108 (prep)

                                                                       Room 108 painted

                                                                             Room 108 painted

                                            Painted drywall repair in Cultural Hall (wet paint)

                                            Painted drywall repair in Cultural Hall (wet paint)

                                                  Rust removed from door in mechanical room

                                                                   Crack in Chapel ceiling

                                       Caulked crack in Chapel ceiling (still visible but not as bad)

                                                                  Dirty beam in Chapel

                                                  Beam painted with Kilz and flat white paint

                                                   New valve on mop sink (working properly)




Will continue working on punchlist tomorrow.  Most items are complete

SC FM maintenance

9-30-11
Charleston Stake Center
10 hrs worked today

Work performed today:

Drywall repair
Change bad tile
Fire caulk

                                                              Hole in drywall in Cultural Hall

                                                                Hole cut out for repair

                                                Hole with tape and mud (will paint on Monday)


                                                          Another hole in Cultural Hall

                                                       Hole with tape and mud (will paint Monday)

                                                             Penetrations in sound room

                                                Penetrations fire caulked with 3 hour caulk

                                                        Old door stop in Mens room

                                                                         New door stop


                                                                   Water stained tile

                                                                               New tile

                                                                        Water stained tile

                                                                                     New tile




We replaced several damaged tile throughout the building. We will start painting over the drywall repairs on Monday and continue on the punchlist